Request a Competitive Quote for Part Number CK-104 LONG LEAD with NSN 5910001135499 by Crl Components Inc!

Part Number: CK-104 LONG LEAD
Alternate P/N: CK104LONGLEAD
Manufacturer: Crl Components Inc
NIIN: 001135499
CAGE Code: 71590
FSG: 59 Electrical and Electronic Equipment Components
Country: USA
NCB Code: 00

Thank you for taking an interest in the top-caliber NSN products we feature here on AI NSN Parts. On this page, you can submit a quote request for part number CK-104 LONG LEAD, a Capacitor Fixed Ceramic Dielectr item that is manufactured by Crl Components Inc. Listed alongside the NSN 5910001135499 within our database, part number CK-104 LONG LEAD is conveniently ready for purchase at any time.

Product Details

“*” Required Fields Are Compulsory

Contact Information

   * By clicking this box, I acknowledge that I have read and accept the ASAP Semiconductor Terms and Conditions and agree that all quotes and purchase orders are exclusively subject to the ASAP Semiconductor Customer Terms and Conditions.
  • I consent to receive email communications from ASAP Semiconductor and can unsubscribe at any time.
  • ASAP Semiconductor is a wholly independent aftermarket parts distributor.
  • This website is intended for quotations based on part numbers only. Please DO NOT submit drawings, technical data, or other specifications through this portal.

Disclaimer: This is a quotation for the goods listed above. This quotation is meant as an estimate and does not reflect a final bill or invoice. All quotations are subject to change until acceptance by ASAP Semiconductor of a binding Purchase Order, and quotations may be withdrawn or revised at the sole discretion of ASAP Semiconductor. This quotation is subject to the ASAP Semiconductor Terms & Conditions available at https://www.asapsemi.com/customer-terms-and-conditions/ . All United States Government and Department of Defense bids are quoted as CAGE code 6RE77 from ASAP Semiconductor’s Anaheim, California facility. Any quotation from ASAP Semiconductor without 6RE77 is void.

Note : We Will Not Share Your Information To Any Third Parties.

Upload RFQ SHEET

To ensure listings like part number CK-104 LONG LEAD are ready for swift installation, we have a rigorous quality assurance program in place. As such, we make it easy for you to inquire about popular NSNs like 5910-00-113-5499, as well as the many other Crl Components Inc products produced under CAGE Code 71590 that interest you. For the benefit of our customers, we carefully vet every entity that we source from, guaranteeing that you only receive superior-caliber offerings in every order. With these dedications, you can always purchase from us with confidence. Furthermore, we also organize our stock based on Federal Supply Classes, so you can find popular items under FSCs like 5910 Capacitors. Do not hesitate to submit the RFQ form below, and within 15 minutes or less of submission, one of our experts will reach out with a customized solution. Get started today and see why so many customers steadily depend on AI NSN Parts for their operational needs.

NSN Information for Part Number CK-104 LONG LEAD with NSN 5910-00-113-5499, 5910001135499

NSNFSCNIINCLSHazmatDEMILCancelled NSN
5910-00-113-5499

Item PartTypeName:

CAPACITOR,FIXED,CERAMIC DIELECTR

59100011354990PA
CIICHCCESDPMICCriticalityENAC
UAA0
Part NumberISCRNVCRNCCHCCMSDSSADC
300-100-610-104Z31CA

Characteristics Data of NSN 5910-00-113-5499, 5910001135499

MRCCriteriaCharacteristic
AAQLBODY STYLEW/O MTG FACILITIES TERMINAL(S) ON ONE SURFACE
AARGRELIABILITY INDICATORESTABLISHED
AARHRELIABILITY FAILURE RATE LEVEL IN PERCENT0.0010
ABJTTERMINAL LENGTH1.250 INCHES MINIMUM
ADAQBODY LENGTH0.290 INCHES NOMINAL
ADATBODY WIDTH0.290 INCHES NOMINAL
ADAUBODY HEIGHT0.090 INCHES NOMINAL
AEBPCENTER TO CENTER DISTANCE BETWEEN TERMINALS PARALLEL TO LENGTH0.200 INCHES NOMINAL
AEBTTERMINAL DIAMETER0.025 INCHES NOMINAL
AEBZSCHEMATIC DIAGRAM DESIGNATORNO COMMON OR GROUNDED ELECTRODE(S)
AGAVEND ITEM IDENTIFICATIONMULTIPLE LAUNCH ROCKET SYSTEM (MLRS)
CQBFINSULATION RESISTANCE AT MAXIMUM OPERATING TEMP10000.0 MEGOHMS
CQBQCAPACITANCE VALUE PER SECTION0.100 MICROFARADS SINGLE SECTION
CQFBVOLTAGE TEMP LIMITS PER SECTION IN PERCENT CAPACITANCE CHANGE-25.0 TO 15.0 WITH RATED VOLTAGE APPLIED SINGLE SECTION
CQJJNONDERATED OPERATING TEMP-55.0 DEG CELSIUS MINIMUM AND 125.0 DEG CELSIUS MAXIMUM
CQWMNONDERATED CONTINUOUS VOLTAGE RATING AND TYPE PER SECTION100.0 DC SINGLE SECTION
CRTPTOLERANCE RANGE PER SECTION-10.00 TO 10.00 PERCENT SINGLE SECTION
CWJKCASE MATERIALPLASTIC
CWPKINSULATION RESISTANCE AT REFERENCE TEMP100000.0 MEGOHMS
CWPMDISSIPATION FACTOR AT REFERENCE TEMP IN PERCENT2.5000
CWSGTERMINAL SURFACE TREATMENTSOLDER
NHCFNUCLEAR HARDNESS CRITICAL FEATUREHARDENED
TESTTEST DATA DOCUMENT81349-MIL-C-39014 SPECIFICATION (INCLUDES ENGINEERING TYPE BULLETINS,BROCHURES,ETC.,THAT REFLECT SPECIFICATION TYPE DATA IN SPECIFICATION FORMAT; EXCLUDES COMMERCIAL CATALOGS,INDUSTRY DIRECTORIES,AND SIMILAR TRADE PUBLICATIONS,REFLECTI
TTQYTERMINAL TYPE AND QUANTITY2 UNINSULATED WIRE LEAD
ZZZKSPECIFICATION/STANDARD DATA81349-MIL-C-39014/2 GOVERNMENT SPECIFICATION

Related NSN Components of CK-104 LONG LEAD

A Complete NSN Part Purchasing Platform

  • AS9120B and ISO 9001:2015
  • Aviation Suppliers Association Member
  • FAA AC 0056B Accredited
  • AS 6081:2012 Certification
  • ESD S20.20-2014 Certification

Thank You for Visiting.

If You’re Ever Looking for NSN parts Or Have an Aircraft On Ground Situation, Don’t forget That We offer Competitive Pricing and Guaranteed On-Time Delivery.

Request for Quote

We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.